Supplying equipment and installing electrical systems, water supply and drainage works: villas, hotels, resorts, commercial centers, factories, factories, industrial parks,…
1. For Light Electrical – Electrical System

Construction and installation of hard pipes threading ceilings in hotel rooms according to 5-star standards. The tube is painted blue, red, yellow to distinguish the function.
- Red: fire alarm wire threading tube
- Blue: light wire threading tube, sound, lan network, Analog TELEVISION and IP TV.
- Yellow: lighting wire threading tube, control switch
- White: socket wire threading tube.
- On the ceiling there are intermediate wire pull boxes, for convenience for pulling the wire.
Use a laser laser, Lego ruler, brush making cut lines and the location of burying the base on the brick wall for accuracy. Then proceed to cut the wall.
Make sure the cut line is straight, according to the drawing so that after the finished unit enters, they do not hit the pipe and the line goes in the tube. The width and depth of the cutting trench are in accordance with the standards set out in the construction measures submitted to the Investor.
Size test Size test Wall pipe construction Chiseling brick walls to pipe, burying soles
Bury the base to the right size. Waiting for the position of dry, hard sound base, bend the tube, nap to the base, fix the tube on the cutting groove. After re-checking the size, fill fills, close the anti-cracking mesh, hand over the wall to the construction of the finished bowl.

Cleaning the base, pulling wires, installing temporary coverings, avoiding paint sticking to wires. It's time to put the equipment cleaned, it takes a lot of work.
Clean the wall sound box before pulling the wire Pull the finished wire Drag the wire into the wall sound box Zip internet wire Pull the network wire and here the electricity Drag an electrical cable into a wall sound box Cut the corrugated iron, cover the entire box after pulling the cord Construction of wall sound box
DEDICATED ADVICE HOTLINE
0905.70.60.89
Click on the link below to find out more information about the Power System in the project
2. For water supply and drainage systems
Locate, seal, drill drain the core of the drainage pipe. Core retractation drilling ensures high accuracy, mounting equipment is not missized.
Supplying equipment and installation of electrical systems, water supply and drainage, light electricity, air conditioning and ventilation, fire protection system.
Digital Age Electromechanical Co., Ltd.
After drilling the core, or conducting parallel processing support, installing support shaft standing technical box, we proceed to erect the vertical shaft of the drainage pipe, then make the branch shaft and in the room. This must be done in order first, otherwise it will be very difficult to connect. Specifically, we will send you the following article.
Four Point Sheraton Hotel Escape Tube Use rehau escape tube – connected by rubber ron Vertical Shaft Drainage Pipe Horizontal Shaft Drainage Pipe Support fixed drainage pipe Vertical shaft construction must have a tube head cover Non-glue escape pipe, fixed with support at specific locations Horizontal escape pipe, with ventilation, used at Four Point Sheraton Da Nang apartment
After connecting the vertical shaft pipe to the branch, we conduct a 24-hour pipe water test.
Exuding shafts, wastewater drainage and ventilation Sealing of drainage pipes Transporting pipes up to the floors through the promotion Vertical axis prepares connection Sealing of drainage pipes
Sealing of drainage pipes
Try it closed within 24 hours.Construction of drainage vertical shafts
DEDICATED ADVICE HOTLINE
0905.70.60.89
Sealing of drainage pipesThe vertical axis is in a closed test state
Sealing of drainage pipes
Sealing of drainage pipesConstruction of escape pipes in hotel rooms Ventilation connections for stool drainage and discharge pipes
Sealing of drainage pipesLavabo sanitary equipment, bridge table, SEN bath TOTO
After the construction of the drainage water, we carry out the construction of the water supply. Drainage requires the slope, height of the pipe as well as the direction of escape, so it must be prioritized for construction first. The water supply pipe is small, again granted pressure on the roof down, so the pipe is easier to operate, the requirements are not as strict as the escape pipe
Construction of water pipes forked about the rooms
Construction of water pipes forked about the rooms
Construction of water pipes in hotel roomsHot and cold feeding tube for lavabo table Hot and cold feeding tube for lavabo and lotus bath standing
Hot and cold feeding tube for lavabo and lotus bath standing
Hot and cold feeding tube for lavabo and lotus bath standingGate valve mounted on the bathroom ceiling
DEDICATED ADVICE HOTLINE
0905.70.60.89
Anti-odor rabbit and tube neck waterproofing Anti-odor rabbit and tube neck waterproofing Water supply pipes are fixed by hanging company Water supply pipe pressure testing
Water supply pipe pressure testingThe test pressure is set at 5Kg/cm2
The test pressure is set at 5Kg/cm2
The test pressure is set at 6Kg/cm2
If you would like more information about the water supply and drainage system, please click on the link below